2
0
mirror of https://gitlab.isc.org/isc-projects/bind9 synced 2025-08-28 21:17:54 +00:00
This commit is contained in:
Andreas Gustafsson 2001-02-15 03:54:21 +00:00
parent 21bb550a25
commit 55dce8c024

View File

@ -1,7 +1,7 @@
Copyright (C) 2000, 2001 Internet Software Consortium.
See COPYRIGHT in the source root or http://isc.org/copyright.html for terms.
$Id: release,v 1.25 2001/02/09 00:08:52 gson Exp $
$Id: release,v 1.26 2001/02/15 03:54:21 gson Exp $
Preparing a bind9 release
@ -127,7 +127,7 @@ release.
- Tag the CVS source tree with the final tag, as in
"cvs rtag v9_0_0rc1 bind9" (mainline) or
"cvs rtag -r v9_1 v9_1_1rc1 bind9" (release branch).
"cvs rtag -r v9_1 v9_1_1rc2 bind9" (release branch).
- Build the release kit. This procedure differs
between the 9.0 release branch and the mainline.
@ -139,7 +139,7 @@ release.
sh configure
make kit
On the 9.1 release branchy or mainline, use the
On the 9.1 release branch or mainline, use the
"util/kit.sh" script.
- Build bind9 from the kit on at least one machine
@ -152,21 +152,21 @@ release.
- Sign the distribution files with the ISC signing PGP key:
pgp -sba bind-9.1.1rc1.tar.gz -u 0x51BAB2ED
pgp -sba bind-9.1.1rc2.tar.gz -u 0x51BAB2ED
- Fix the permissions on the signature file:
chmod 644 bind-9.1.1rc1.tar.gz.asc
chmod 644 bind-9.1.1rc2.tar.gz.asc
- Verify the PGP signature:
pgp bind-9.1.1rc1.tar.gz.asc bind-9.1.1rc1.tar.gz
pgp bind-9.1.1rc2.tar.gz.asc bind-9.1.1rc2.tar.gz
- Prepare a release announcement based on the previous one.
- Copy the distribution and PGP signature files to the FTP site:
ver=9.1.1rc1
ver=9.1.1rc2
ssh -n isrv4.pa.vix.com "mkdir /udir/ftp/isc/bind9/$ver"
scp bind-$ver.tar.gz bind-$ver.tar.gz.asc \
isrv4.pa.vix.com:/udir/ftp/isc/bind9/$ver